The Office Build-Out Timeline

The Office Build-Out Timeline

If you were hoping for a fixed timeline, we have to disappoint you. The duration of an office build-out depends on several factors. This article will guide you through these variables, helping you hack the construction process. 

Transforming your office into a space where your team can flourish takes time. By continuing to read, you’ll gain insights that will better prepare you for the steps following your selection of the perfect office space. 

The Lease and the Work Letter 

When your lease is signed, you likely have a general idea of how long potential renovations will take, based on the building’s initial condition. This shouldn’t be a surprise if you toured the space during the site selection process. 

Regardless of the condition of your new leased property, the first stage of your build-out timeline should include negotiating the work letter. The terms set out here will affect your office setup and tenancy throughout your stay, so be prepared for these negotiations. 

The work letter outlines the conditions that must be met during the build-out of the newly leased space. This clause is comprehensive and can sometimes appear as a separate document in addition to the lease. At the very least, it should include: 

– The tenant’s plans and expectations 

– Timelines for the build-out (including plans, approval dates, and construction schedule) 

– Costs covered by the landlord (and possibly the tenant) 

– Contractors conducting the work 

– Building permit requirements 

– Total cost of the build-out 

– Payment forms and schedules 

– Acceptance of work, possession, and occupancy 

This document is crucial for protecting tenants by clearly defining responsibilities and consequences if they are not met. Tenants with larger projects should anticipate a longer negotiation process due to the increased number of details, contractors, and plans that need to be finalized, compared to a simple aesthetic renovation. 

Construction Drawings and Design 

At this stage, your landlord might have already had their architect complete a test-fit, a simple drawing to see how well you fit in their space. Landlords often do this for prospective tenants to give estimated timelines and a potential design of the floor plan. 

Often, the landlord will have an in-house contractor or preferred person estimate the work to be done and its cost, including: 

– Doors 

– Framing studs 

– Sheetrock 

– Lighting 

– Outlets 

– Electric Wiring 

– HVAC 

– Millwork 

– Floor coverings, and more 

The design phase will adapt the existing space to your primary business needs. During design development, some changes are expected to finalize your space plans and ensure they fit your staff’s workflow. 

After the initial construction drawings, you should better understand how your company will use the office. The initial design will then be detailed further. This information is crucial for deciding on interior features like furniture placement, heat load, outlet locations, and lighting. The final construction drawings should help you estimate construction costs accurately. 

You can choose to work with the landlord’s team or your own design team for your new office, but you need to ensure that the bid you receive reflects the actual cost of the build-outs. The design process and final construction pricing will depend on the general contractor you select. 

Collaborating with the design development team for initial programming and space plans will likely take around 2 to 4 weeks. 

Office Space Construction  

Construction projects are known for their frequent delays. It’s wise to anticipate potential setbacks when planning office renovations. This helps avoid major disruptions and losses in time and money. 

Ensure your lease includes clauses that protect you if delays occur.  

The condition of the building significantly impacts the renovation timeline. A property needing extensive work, like those in a shell condition, often faces more delays.  

First-generation build-outs generally take longer. These spaces have never been occupied and need more work. In contrast, second-generation spaces, previously used by another tenant, might require less work, depending on your needs. Even if you decide to start fresh by removing existing structures, major components like ductwork and outer walls are already in place. 

For largely unfinished spaces, often referred to as cold dark shells, expect minimal fixtures. Though the specifics can vary, these spaces typically need more extensive work to become fully functional. 

Greenfield, Shovel-Ready, and Build-to-Suit 

When you sign a lease under these terms, you’re committing to a lengthy process. Whether construction has already started, or the land is marked for building, you’re preparing for the long run. 

Starting with a vacant lot, either dirt or grass, means you’ll face a lengthy construction period. This depends on zoning and permit approvals. The size and complexity of your project can extend this timeframe, sometimes lasting from several months to a few years. 

Timing can be tricky, especially when aligning with the end of your current lease. 

Cold Dark Shell 

A cold dark shell is essentially a building in its most basic state. It’s a bare-bones structure with no HVAC, no lighting, no ceilings, and no flooring. Essentially, it consists of: 

– Four walls 

– A roof 

– Unfinished floors 

This condition offers tenants maximum flexibility to customize the space. However, it also requires significant renovations, time, and upfront costs. Consequently, the initial rent might be lower. 

One important note: If you start with a cold dark shell, negotiate for a substantial tenant improvement allowance. Much of this allowance will be used to transform the space into a more livable condition before any specific office work can begin. 

You don’t want construction expenses to diminish your TI allowance while the landlord benefits from a more improved space when you move out. 

From design to construction completion, preparing a cold dark shell space can take up to eight months. 

Warm Shell Office Spaces 

Whether it’s a second-generation or fresh start, warm shell spaces are move-in ready with minimal build-out required. They typically include essential features like ceilings, basic finishes, plumbing, HVAC, electrical outlets, and more. Aesthetic updates can be completed in up to five months, depending on initial conditions. 

Plan Your Build Out with a Tenant Rep 

Partner with a professional to ensure your space meets your business needs. Negotiating optimal terms will potentially save you millions in lease costs. Whether it’s a shell condition or second-generation space, a professional will secure the best deal for your new office. 

FAQs  

What factors influence the timeline for office build-outs? 

The timeline depends on the extent of renovations needed and the condition of the space. Simple updates might take a few weeks, while more extensive remodels could stretch to several months. 

How can I speed up the office build-out process? 

Working with experienced contractors and having clear, detailed plans can help expedite the build-out. Planning ahead and addressing any potential issues early on can also prevent delays. 

Do I need to hire a tenant representative for my office build-out? 

While not mandatory, a tenant representative can be invaluable. They help negotiate lease terms, manage the build-out process, and ensure your new office meets your business needs efficiently.